(As of March 31,2011) |
 |
 |
The Chugoku Electric Power Co.,Inc. |
 |
Generation, transmission, and distribution of electric power |
 |
|
|
(Head Office) |
4-33 Komachi,Naka-ku,Hiroshima-shi,Hiroshima
730-8701,Japan
Tel: +81-82-241-0211 Fax: +81-82-523-6185 |
|
(Tokyo Office) |
1-8-2,Marunouchi,Chiyoda-ku,Tokyo
100-0005,Japan
Tel:+81-3-3201-1171 Fax:+81-3-3212-1067 |
|
 |
May 1,1951 |
 |
¥185,527 million |
 |
371 million |
 |
148,751 |
|
|
 |
 |
9,822(Total on-site staff) |
 |
5,199 thousand |
 |
62,395 million kWh |
 |
¥10,288 billion |
|
|
 |
 |
| Thermal |
12 |
| Hydroelectric |
97 |
| Nuclear |
1 |
| Total |
110 |
|
 |
| Thermal |
7,801 |
| Hydroelectric |
2,906 |
| Nuclear |
1,280 |
| Total |
11,986 |
|
|
|
 |
 |
Route length 8,355 km |
|
|
 |
 |
| Number of substations |
466 |
| Authorized capacity |
50,571 MVA |
|
|
|
 |
 |
Route length 82,116 km |
|
|
 |

(Click) |
|

(Click) |
|
| Power Station, Transmission Line, Major substation, Major switching station, etc. |
|
|
| (*1) |
The Company’s fiscal year begins on April 1 and ends on March 31 of the following year. In this profile, fiscal 2009 is used to denote the year ended March 31,2010. |
| (*2) |
All figures have been rounded. |
|