EnerGia With You and With the Earth
homesitemapfaqcontactlinksjapanese
 
The Chugoku Electric Power Co.,Inc.
Seeking to Realize Inherent Potential of Energy
Procurement Activities
Introduction
Profile
Basic Procurement Policy
What We Ask of Our Suppliers
Major Procurement Items

Procedures
Selling Products to Chugoku Electric
Standard Procurement Procedures

New Suppliers Sought

Notice
Main Procurement Plan of Materials and Equipment in Fiscal 2009
Publication of Procurement Information

Copyright(c) The Chugoku Electric Power Co.,Inc.

Check terminals
1. Use

Used as test terminals that are attached for power factor measurements and on-site testing of transformer-equipped supply meters.
2. Major specifications

Casing : Structure that enables sealing and prevents water from getting inside.
Junction/junction
receiving-unit conductor
: Connection must be complete, both electrically and mechanically.
Junction must be compatible.
Wires for 7-core instrument cable (with conductor thickness of 3.5 to 14 mm2)must enable individual and complete tightening. Tightening must be complete, both electrically and mechanically.
Insulation must be provided between unlike poles and between same poles without junctions.

Major members
Name of Part Material
Casing ABS resin
Base plate Bakelite plate
Junction receiving-unit conductor Brass
Junction Brass/synthetic resin
Insulated screw for test lead Brass/synthetic resin
Sealing screw Brass

Application form