
|
 |
| Seeking to Realize Inherent Potential of Energy |
 |
|
 |
Procurement Activities |
 |
| Copyright(c) The Chugoku Electric
Power Co.,Inc. |
|
 |
Check terminals
| 1. |
Use |
|
Used as test terminals that are attached for power factor measurements and on-site testing of transformer-equipped supply meters. |
| 2. |
Major specifications |
|
| Casing |
: |
Structure that enables sealing and prevents water from getting inside. |
Junction/junction
receiving-unit conductor |
: |
Connection must be complete, both electrically and mechanically.
Junction must be compatible.
Wires for 7-core instrument cable (with conductor thickness of 3.5 to 14 mm2)must enable individual and complete tightening. Tightening must be complete, both electrically and mechanically.
Insulation must be provided between unlike poles and between same poles without junctions. |
|
|
Major members |
| Name of Part |
Material |
| Casing |
ABS resin |
| Base plate |
Bakelite plate |
| Junction receiving-unit conductor |
Brass |
| Junction |
Brass/synthetic resin |
| Insulated screw for test lead |
Brass/synthetic resin |
| Sealing screw |
Brass |
|
 |
|
|