We expect to have about 10,000kW of mega-solar power by fiscal 2020. The first step toward this is the construction of a 3,000kW mega-solar power plant in Fukuyama, Hiroshima Prefecture, which went into operation in December 2011.
Fukuyama solar Power Plant
| Location |
Minooki, Fukuyama-City Hiroshima Prefecture |
| Output |
3,000kW |
| Annual electricity generation |
About 3.68 million kWh(*) |
| CO2 reduction |
2,100 t-CO2/year |
| Start of operation |
December 1st, 2011 |
|
 |
*enough to meet the typical electric power needs of about
1,000households for a year |