Development of Mega-Solar Power Plants

In December 2011, Chugoku Electric started operation of the Fukuyama Photovoltaic Power Station (3 MW), and generated 4,535 MWh in fiscal 2013.
We went into operation of a second power station, Ube Photovoltaic Power Station (3 MW) in December 2014.

Fukuyama Photovoltaic Power Station

Location Minooki, Fukuyama-City Hiroshima Prefecture
Output 3,000kW
Annual electricity generation About 3.68 million kWh *1
CO2 reduction 2,100 t-CO2/year
Start of operation December 1st, 2011
Fukuyama solar Power Plant
  • *1enough to meet the typical electric power needs of about 1,000 households for a year

Ube Photovoltaic Power Station

Location Nishi-Okinoyama, Ube-City Yamaguchi Prefecture
Output 3,000kW
Annual electricity generation About 3.52 million kWh *2
CO2 reduction 2,000 t-CO2/year
Start of operation December 1st, 2014
Ube Photovoltaic Power Station
  • *2enough to meet the typical electric power needs of about 900 households for a year
PageTop